SHIFT 4 KOREA HEADQUARTERS
LOCATION:
myeong-dong, joong-gu, seoul, korea
AREA:
336.79 sq.m (101.88 py)
CHRONOLOGY:
design period: 2026.03~06
construction period: 2025.05~06
KEY MATERIALS:
paint over exposed concrete, interior film, decotile flooring