S.M.K. DONKATSU DINER

LOCATION:
dukpoong-dong, hanam-shi, kyunggi-do, korea

AREA:
57.35 sq.m

CHRONOLOGY:
design period: 2013.02
construction period: 2013.03

KEY MATERIALS:
clear epoxy resin over exposed concrete, wallpaper, chalkboard paint, paint over drywall


CONSTRUCTION PROCESS

3D STUDY

MATERIAL PALETTE
(from left to right)

1. Synthetic grass
2. Clear epoxy resin over cement
3. Chalkboard
4. Oriented strand board